Infrastructure
The first B.O.T.
project in Kerala ,the Mattanchery Bridge was coordinated by GCDA. In addition,
Kathrikadavu Railway Overbridge & Chilavannur Bund road bridge in Chilavannur
puzha has been constructed by GCDA.
In road transport sector, apart from the roads developed as part of area
development schemes, in Panampilly Nagar, Gandhi Nagar,Aluva,
Rameswaram,.Paruretc,G.C.D.A has recently completed the 3.2 Km. long & 22m. wide
Kaloor- Kadavanthra road , 15 m. wide Subhash Chandra Bose Road, Chilavannur
Bund Road( partially completed) and K.P.Vallon Road widening first phase,
Panampilly Nagar Anamthuruthy road (partially completed) were taken up by
G.C.D.A. Land has been made available to the corporation for the construction of
2Km.long & 22 m, wide Stadium Link Road, by GCDA by negotiation with the land
owners.G.C.D.A. had taken a major role in the implementation of the 22m. wide &
3Km.long Sahodaran Ayyappan Road by getting land surrendered free of cost with
the cooperation of Cochin Corporation.
Widening of Kaloor Palarivattom Road was taken up by State P.W.D. with the
co-operation of GCDA in getting the land surrendered free of cost for road
widening.
To decongest the south R.O.B. & to reduce traffic on M.G.Road & Chittoor road
the eastern entry to the South Railway station was developed by G.C.D.A. Greater
Cochin Development Authority has thus developed a total of about 75 Km. of road
length of varying widths ranging from 7m to 36m with in the Greater Cochin
Region.
 |
|
|
|